No | Nama Peserta | K | SK | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. MITRA TEKNIK KONSULTAN - 01.794.897.7-322.000 | 69,67 | 83,92 | Rp. 246.350.000,00 |
Rp. 246.350.000,00 |
||||||||
2 | CV. MENARA YAMA - 01.278.775.0-323.000 | 70,37 | 86,43 | Rp. 247.023.000,00 |
Rp. 247.023.000,00 |
||||||||
3 | RC CONSULTANT - 74.899.187.4-322.000 | 39,14 | |
|
|||||||||
4 | CV. DWI ARTHA KONSULTAN - 01.991.489.4-323.000 | 64,43 | |
|
Tidak memasukan penawaran | ||||||||
5 | CV. SEMAR MESEM gmbh - 03.192.922.7-322.000 | 63,77 | |
|
|||||||||
6 | PT. BATU RADEN - 01.278.283.5-323.000 | 82,95 | |
|
Tidak memasukan penawaran | ||||||||
7 | CV. NADIA UTAMA WAJA - 01.919.462.0-322.000 | |
|
tidak melampirkan SBU | |||||||||
8 | CV. REKA KARYA KONSULTAN - 02.880.653.7-322.000 | 90,0 | |
|
Tidak memasukan penawaran | ||||||||
9 | CV. GRAHA CIPTA ENGINEERING - 75.986.217.0-322.000 | |
|
||||||||||
10 | cv Bandar Agung Abadi - 01.660.645.1-326.000 | |
|
||||||||||
11 | PT. Akbar Jaya Konsultan - 01.824.917.7-323.000 | |
|
||||||||||
12 | CV.Karya Mulya Mandiri - 02.645.492.6-322.000 | |
|
||||||||||
13 | PT. Sumber Daya Teksindo - 01.597.841.4-323.000 | |
|
||||||||||
14 | CV. KARYA CIPTA UTAMA - 01.519.563.9-322.000 | |
|
||||||||||
15 | PT. PLATO ISOIKI - 01.519.530.8-323.000 | |
|
||||||||||
16 | CV. TRIBUANA ARTHA - 02.645.550.1-323.000 | |
|
||||||||||
17 | PT. PRIMA RESTU KREASI - 01.278.768.5-323.000 | |
|
||||||||||
18 | CV. WIDYA WAHANA - 01.550.811.2-323.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak